Direct answer
Chinese New Year adds roughly four to six weeks to a normal schedule, and how much depends on which side of the holiday your production falls. Bulk production runs 30–45 days after order confirmation, with 25 days as the fastest possible schedule, and sampling takes 15–25 days. If your container has to sail before the holiday, place the order 45–60 days earlier than you would in any other month.
Production is only one of four things that stop at the same time. Trucking capacity tightens as drivers travel home, ports and forwarders book out two to three weeks ahead of the holiday, and the smaller suppliers behind a sofa — foam, mechanisms, motors, cartons — usually close earlier than the assembly lines they feed. A factory that stays open still cannot build what its suppliers have not delivered.
| Window | What is actually the constraint | What to do |
|---|---|---|
| Last 3–4 weeks before the holiday | Container space and trucking, not the line | Book the sailing first, then release production |
| The holiday period | Factories, suppliers and offices are thin | Do not schedule inspection or sampling that needs factory sign-off |
| First 3–4 weeks after | Restart, backlog and new-worker ramp-up | Expect a slower first batch and keep buffer stock on best sellers |
Three decisions lock the date: finish the specification early, because sampling alone needs 15–25 days; pay the deposit so material can be reserved before suppliers close; and fix the sailing with your forwarder before production starts. An order placed in the last month before the holiday rarely ships in that month — it moves to the first or second vessel after the factories restart.
A European retailer needed a 1×40HQ of a 1+2+3 fabric set, one model in two colours, to sail in January. Sampling was signed off in October, the order confirmed in late November, production ran 35 days, and the container loaded in the second week of January. Confirmed three weeks later, the same order would have shipped in March. The 45–60 day buffer was the difference.
Yes, we can schedule a start date after the restart. The order still needs its specification and deposit before the holiday, because capacity slots and material are committed at order date; the 30–45 day clock starts when production starts, not when the order is placed.
It does. Sampling takes 15–25 days and needs pattern makers, material and a hand sample line. Requested in the last two weeks before the holiday, it almost always lands after, pushing the bulk order back a full cycle.
For samples and urgent spares, yes. For a 1×40HQ of sofas, no — volume and weight make it uneconomic. Expedited production at 25 days is the cheaper lever, and it still has to fit the pre-holiday booking window.