Home / All / Order and Production / Can you expedite an urgent order, and how fast can you ship?

Can you expedite an urgent order, and how fast can you ship?

Update Time:2026/10/16

Direct answer

Yes — when your container slot or seasonal window is fixed, we can expedite production. Bulk production normally runs 30–45 days after order confirmation; the fastest bulk schedule is 25 days. Stock-programme quick runs take 15 days, or 10 days fastest.

30–45 / 25 daysBulk: standard / fastest
15 / 10 daysStock quick run / fastest

What decides whether an order can be expedited

Volume and model mix

Bulk production is quoted at 30–45 days; larger runs and more models leave less room to compress.

Season

Schedules float with order volume and season, so peak months need to be booked early.

New or repeat model

A complex new ODM model needs extra engineering and testing time. Repeat models move fastest.

Specification sign-off

Sampling takes 15–25 days once details are confirmed; production opens after approval.

PandaSofa showroom recliner display floor with single recliners and modular recliner sofas
Standard showroom models move fastest on quick-run programmes.

How to lock the fastest possible date

1

Send your target date, model list, quantity and colour split.

2

We confirm which models qualify for the quick-run window.

3

Sign off samples or drawings — 15–25 days on custom programmes.

4

Production runs, then inspection and loading at Ningbo or Shanghai.

ProgrammeTypicalFastest
Custom sampling15–25 daysRuns first
Bulk production30–45 days25 days
Stock quick run15 days10 days

Retailers with a fixed seasonal date put best-selling models on the quick-run line and plan the rest inside the bulk window.

Limits to plan for

Fastest windows need settled specifications — an open colour or mechanism choice holds release.

Shipping is separate: we confirm production, inspection and loading; the carrier's sailing schedule is not.

PandaSofa power recliner with reading light and wireless charging in a showroom setting
Smart features add engineering steps — plan them into the date.

Related questions

What do you need to confirm a rush schedule?

A target date, the model list, quantities and colour split, destination port, and sample approval — production cannot start before the specification is settled.

Can a new ODM model use the fastest schedule?

No. Complex new ODM functions need extra engineering and testing time, and sampling alone takes 15–25 days after details are confirmed.

Why does lead time change with season?

Bulk production floats with order volume and season, so the same model can quote differently by month. Confirm early.

PandaSofa showroom brand wall with a row of leather and fabric recliner chairs
Repeat models from the current range ship fastest.

In short: bulk 30–45 days (fastest 25), stock quick runs 15 days (fastest 10), sampling 15–25 days.

Recliner sofa and lift chair ranges

Contact Person
Mandy Guo
Full Name:
Mandy Guo
Tel:

+86 13065823738

Email:
mandy@pandasofa.com
WhatsApp:
8613065823738
Address:
Building D-1, Gongfu Industrial Park, Gangkou Village, Tianhuangping Town, Anji County, Huzhou City, Zhejiang Province, China
follow us